TRACK RECORD
The record GRITEK is built on.
23
YEARS ON
THE RECORD
4
MAJOR
OPERATORS
Zero
TOTAL SHUTDOWNS
ON STANDBY
100%
RETURNED TO
VERIFIED SERVICE
01 · CHEVRON NIGERIA · OKAN OFFSHORE OIL FIELD
Offshore mud cuttings evacuation, under live drilling
On Chevron's Okan offshore field, drilled by a Trident jack-up rig, the founder ran the mud cuttings evacuation as superior field technical head, keeping live drilling supplied while spent water-based mud and cuttings were cleared from the rig safely.
WHAT WAS DELIVERED
EVACUATION CREW · FULL TYVEK PPE
OUTCOME
Drilling sustained without interruption, with no discharge incident.
02 · DANGOTE PETROLEUM REFINERY · IBEJU-LEKKI
SOFEC SPM-C1 single point mooring, mobilisation and load-out
On the Dangote refinery's SOFEC SPM-C1, the offshore mooring through which the refinery receives crude by very large crude carrier, the founder served as technical lead for the mobilisation and load-out of the buoy.
WHAT WAS DELIVERED
SOFEC SPM-C1 · DANGOTE REFINERY
OUTCOME
Mobilised and loaded out to standard as technical lead, on one of the largest installations of its kind on the continent.
03 · OANDO ENERGY RESOURCES (FORMERLY NAOC) · MOST RECENT & ONGOING
Continuous standby power maintenance, terminal and flow stations
The founder's longest-running engagement, originating at NAOC in 2003 and continuing with Oando Energy Resources across the Brass crude export terminal and the Obama, Ogboinbiri and Clough Creek flow stations. As resident standby maintenance, the brief is absolute: the generating fleet stays available, because these sites run under continuous, zero-tolerance power demand.
WHAT WAS DELIVERED
CAT EIS · ENGINE CONTROL MODULE
MITSUBISHI EDG · 1,600 kVA
OUTCOME
Zero total operational shutdown across the engagement; every set kept available and returned to verified service.
04 · NNPC PPMC · ESCRAVOS
Crude tank cleaning and sludge recovery, Tank 104
At NNPC PPMC's Escravos terminal, the founder deployed a Megamacs spread to clean crude storage Tank 104 and recover usable hydrocarbon from the tank-bottom sludge.
WHAT WAS DELIVERED
MEGAMACS SLUDGE SPREAD · TANK FARM
OUTCOME
Tank bottom cleared, recoverable hydrocarbon returned to use, residue contained to environmental standard.
OPERATORS ON THE FOUNDER'S RECORD
OPERATIONAL FOOTAGE
See the work running.
Grit. Knowledge. Delivered.
Technical services delivered to the standard the most critical assets demand.
Speak to GRITEK →