HOW WE WORK

Do it well, or not at all.

That is the GRITEK code. It is also why most of a job happens before we touch the machine: three phases of planning, then one of execution.

THE APPROACH

Three phases of planning. One of execution.

Most of the work is done before the work begins. That is not slowness, it is how high-consequence operations are delivered safely, and right the first time.

PLANNING · PHASES 01-03
EXECUTION · 04
Site assessment · permits · diagnosisThe planned operation

THE FOUR PHASES

01

PLANNING

Request and site assessment

Every job begins with your request, by work order, email or call, followed by a site visit. We assess the asset and the conditions in person before we commit to anything.

02

PLANNING

Safety and permits

We raise the permit-to-work and every other permit the operation requires, accounting for weather, environment and the nature of the job. The crew works through a Job Safety Analysis (JSA) or Job Hazard Analysis (JHA) together, and signs it, before a tool is lifted.

03

PLANNING

Diagnosis and solution

We troubleshoot the machine or system and fix the method in advance, the parts, the mechanical and safety items, and the sequence the solution will follow. Nothing critical is improvised on the day.

04

EXECUTION

The planned operation

Only now do we execute. The work runs to the plan the first three phases built, which is why the asset goes back verified, on time, and without surprises.

START HERE

It starts with a site visit.

Send a work order, an email or a call. We assess the asset, plan the job, and take it from there.

Contact GRITEKSee the track record
© 2026 GRITEK Engineering & Technical Services Ltd. · RC 0000000 · 100% IndigenousLagos, Nigeria